Residential Construction

Homes built from the first marking.

From an empty plot to the day you turn the key — planned around how your family actually lives, and specified in writing before anyone starts digging.

What we build

Different plots.
The same standard.

A first home on a narrow plot and a villa with room to breathe ask for very different drawings. What doesn't change is the structure underneath, the way it's specified, and who answers for it.

Independent Houses Villas Duplex / Triplex Row Houses Farmhouse Custom Design
RCC frame of a house under construction Brick masonry wall being built Site team at work Reinforcement steel tied for a slab
What's involved

Nine stages, in the right order.

A house is never one decision — it's a sequence. Skip a stage or rush it, and you pay for it later, usually in a place you can't reach any more. This is the order we work in.

01

Plot assessment

We visit the plot and look at access, levels, soil, orientation and the neighbours — then tell you what it will realistically take to build here.

02

Planning & drawings

Floor plans, elevation, structural and MEP drawings — developed with you and frozen before anyone starts digging.

03

Foundation

Excavation, PCC, footings and plinth — sized by the structural design and the soil, not by habit or by what was done next door.

04

RCC structure

Columns, beams and slabs. The stage that decides how long the house lasts, and the one we're least willing to negotiate on.

05

Masonry

Walls, lintels and chajjas built to the drawing, plastered and cured properly before anything is allowed to cover them.

06

MEP services

Electrical, plumbing and sanitary lines laid to the layout you approved — while the walls are still open and changes are still cheap.

07

Plaster & finishing

Putty, paint, flooring, tiling, doors, windows and fittings — the parts of the house your hands actually meet every day.

08

Elevation

Façade detailing, texture, cladding and external finishes, executed to the design you signed off — not improvised at the end.

09

Handover

Final checks, a snag list worked through, cleaning, and keys — with the documentation that goes with them.

Specification

What actually goes
into the building.

This is the part most quotations leave comfortably vague. Below is the specification language we work to, category by category — written the same way it appears in your contract.

  • 2D floor plan for each level, developed with you
  • 3D elevation views before the façade is finalised
  • Structural drawings issued by a qualified structural consultant
  • Electrical, plumbing and sanitary layout drawings
  • Drawings prepared to suit the approvals your plot requires
  • Working drawings and details issued to site as construction progresses
  • Design-stage revisions as agreed in your contract
  • RCC framed structure — columns, beams and slabs designed for the plot and its loading
  • M20 / M25 grade concrete as per structural design, higher where the design calls for it
  • ISI-marked Fe 500 / Fe 550 grade TMT reinforcement steel
  • ISI-marked OPC / PPC cement from a reputed manufacturer
  • Design mix or nominal mix concrete as specified by the structural consultant
  • Clean, graded sand and aggregate — washed where the specification requires it
  • Slump and cube-test checks at pours, as specified in the structural design
  • Curing of RCC members for the duration specified
  • Foundation type — isolated, combined or raft — decided from soil condition and structural design
  • Soil investigation and bearing capacity assessed before foundation design where required
  • Excavation to the depth shown on the structural drawing
  • PCC bed below footings
  • Plinth beam as per structural drawing
  • Anti-termite treatment at plinth level where specified
  • Backfilling and compaction in layers
  • Red clay brick, concrete block or AAC block walls — as agreed in your specification
  • External walls generally 9" and internal walls 4½", unless the drawings say otherwise
  • Cement mortar in the ratio specified for each wall type
  • RCC lintels and chajjas as per drawing
  • Internal plaster and external plaster in cement mortar, with waterproofing compound where required
  • Masonry curing for the duration specified
  • Vitrified tile flooring in living, dining and bedrooms — size and finish from your package range
  • Anti-skid ceramic or vitrified tiles in bathrooms, balconies and utility areas
  • Ceramic wall tiles in bathrooms up to the height specified
  • Granite kitchen counter with a tiled dado above
  • Skirting to match the floor finish
  • Staircase in the material specified for your package
  • Double-charge vitrified tiles or natural stone available as an upgrade
  • Parking and terrace flooring as per specification
  • Concealed conduit wiring with ISI-marked FR / FRLS copper cable
  • Modular switches and sockets from your package range
  • Light, fan, socket and heavy-load points as per the electrical layout you approve
  • MCB distribution board with ELCB / RCCB protection
  • Provision for AC, geyser, chimney, inverter and washing machine where marked on the drawing
  • TV, telephone and internet conduiting where marked
  • Earthing as per code
  • ISI-marked CPVC / UPVC pipes for supply lines
  • PVC / SWR pipes for drainage and rainwater
  • Concealed plumbing with accessible control valves
  • Sanitary ware and CP fittings selected from your package range
  • Bathroom and wet-area waterproofing before tiling
  • Terrace and balcony slopes set for rainwater discharge
  • Septic tank or drainage connection as per site and local requirement
  • Main door with a seasoned hardwood frame and a designer shutter, as per your package
  • Internal doors with flush or moulded shutters on hardwood or engineered frames
  • Bathroom doors with a moisture-resistant shutter
  • UPVC or aluminium windows with glass and mosquito mesh where specified
  • Hardware — hinges, locks, handles and stoppers from your package range
  • MS or SS railings and grills as per drawing, where included in your scope
  • Wall putty and primer on internal walls before finish coats
  • Interior emulsion in the finish level specified for your package
  • Exterior emulsion or weather-resistant coating on external surfaces
  • Enamel or PU finish on wood and metal surfaces where applicable
  • Ceiling finish as specified for your package
  • Colour selections confirmed with you before application
  • Underground sump of the capacity specified for the home
  • Overhead tank — food-grade multi-layer plastic or RCC, as specified
  • Pump and level control as per specification
  • Separate lines for borewell and municipal supply where applicable
  • Rainwater harvesting provision where required by local norms
  • Elevation designed as part of your drawings and approved before execution
  • Plaster, texture, cladding, louvers or ACP detailing as per your package level
  • Parapet, railing and terrace detailing as per drawing
  • External lighting provisions where marked
  • Compound wall and gate quoted separately unless included in your scope

Exact makes, models and quantities are confirmed in your project contract. The lines above describe the standard we build to. The specific selections are made with you, priced, and written into the agreement before work starts — not decided quietly on site afterwards.

Related work

Residential builds across Indore.

View all projects

Note: project imagery is placeholder photography while our own project photos are added.

Common questions

Before you commit.

Yes. If you already have drawings, we review them for buildability and cost, and tell you honestly where we'd do something differently and why. You decide. If you don't have drawings, preparing them is part of the scope — floor plans, elevation, structural and MEP — and nothing goes to site until you've approved them.

It depends on built-up area, number of floors, design complexity, approvals and what the site throws up — so we won't quote you a number before seeing the plot. What you do get, before work starts, is a stage-wise timeline written into your contract, and early notice the moment something looks likely to move.

Usually yes, as long as the stage hasn't passed — flooring is easy to reconsider before it's laid and expensive afterwards. Any change to the specification is priced and recorded in writing before it's executed. Nothing on your specification changes quietly.

We'll tell you which approvals your plot needs and prepare the drawings required for them. Statutory fees and the sanctions themselves usually sit outside the construction scope — that's spelled out in your contract at the start, so it isn't a surprise later.

Have a plot?

Let's see what
it can hold.

Send us the location and roughly what you have in mind. We'll assess the plot and come back with a realistic view of cost, timeline and specification.