Turnkey Projects · Indore

One contract. One team. One timeline.

End-to-end responsibility from the first drawing to the day the keys change hands — with one person answerable for all of it.

One contractDesign to handover in a single agreement — no gaps between vendors.
One point of contactOne person who knows the project and is accountable for the answer.
A written specificationInclusions and exclusions agreed on paper before work starts.
One timelineEvery stage sequenced against the next, with updates as each one closes.
Overview

Projects rarely fail in the
middle. They fail in the gaps.

A designer, a contractor, a plumber and a carpenter can each do their own job well and still hand you a building that doesn't work. The gaps between them are where budgets drift, timelines slip, and nobody is quite responsible.

Turnkey removes the gaps. One contract covers the whole scope — consultation, design and drawings, approvals coordination, procurement, construction, services, finishing and handover. One team runs it. One point of contact answers for it. And the specification you agreed at the start is the one you're handed at the end.

RCC frame of a turnkey project under construction Reinforcement steel tied on site Completed home handed over to the owner Site team at work
Who it's for

For people who want a
building, not a second job.

Running a construction project is a full-time role: chasing trades, comparing quotes, being on site when the concrete arrives, and deciding things you were never trained to decide.

Turnkey is for people who would rather approve decisions than chase them — and who want one number, one scope and one name against the outcome.

This is usually the right fit if…
  • You have a plot and would rather not assemble a team yourself
  • You don't have time to be on site chasing five different trades
  • You want one scope and one number, agreed in writing before work starts
  • You're building from another city and need someone accountable on the ground
  • You want the people who drew it to be the people who build it
  • You'd rather approve a specification than mediate between vendors
What turnkey means

Single-point responsibility,
in practice.

"Turnkey" is used loosely by a lot of people. Here is exactly what it means when we say it.

One contract

The whole scope — design through handover — sits in a single agreement, so nothing falls between two vendors.

One point of contact

One person who knows the project, answers the phone, and is accountable for the answer they give you.

A written specification

Materials, finishes and inclusions agreed in writing before work starts — not negotiated on site afterwards.

Coordinated procurement

Material planned against the schedule and ordered to spec, so the work doesn't wait and the site isn't a warehouse.

Design that gets built

Drawings made by people who will have to build them, so the detail survives contact with the site.

One timeline

Every stage sequenced against the next, so a slip in one place doesn't quietly become a slip everywhere.

The journey

Eight stages, one team.

From the first conversation to the keys — the same people the whole way through.

01

Consultation

We understand the plot, the brief and the budget — and we visit the site.

02

Design & drawings

Layouts, elevations and structural drawings, developed until you sign them off.

03

Approvals coordination

We prepare and coordinate the drawings and documentation your approvals need.

04

Procurement

Material planned against the schedule and ordered to the agreed specification.

05

Construction

Foundation, RCC, masonry and plaster — reviewed stage by stage before the next begins.

06

Services

Electrical, plumbing and drainage installed and tested before the walls close.

07

Finishing

Flooring, joinery, paint and fittings — to the specification in your contract.

08

Handover

Final checks, snag closure, documentation and keys in your hand.

Inclusions

What's in, and what's honestly not.

A turnkey contract is only as good as its exclusions. Both lists are below, and both go into your contract — so there's nothing to discover later.

  • Design development — layouts, elevations and the drawings needed to build
  • Structural design and detailing as per the engineer's requirements
  • Coordination of the drawings and documentation your approvals require
  • Excavation, foundation and RCC structure as per the structural design
  • Masonry, plaster and waterproofing to the agreed specification
  • Concealed electrical, plumbing and drainage, tested before the walls close
  • Flooring, doors, windows, painting and elevation finishing as per the package
  • Sanitaryware, CP fittings and electrical fittings within the specified range
  • Site supervision, stage-wise quality checks and a single point of contact
  • Snag closure and handover with your project documentation
  • Cost of the plot and any charges tied to its purchase or registration
  • Government approvals, sanction fees, statutory charges and deposits
  • Compound wall, gate, gate pillars and external landscaping
  • Site-specific work: rock excavation, deep or special foundations, retaining walls, soil filling or levelling beyond the assessed scope
  • Electricity, water and drainage connection charges payable to the authorities
  • Borewell, water storage beyond the specified capacity, and rainwater harvesting where not specified
  • Loose furniture, appliances, curtains and décor
  • Lift, solar, home automation and similar systems unless added to the scope in writing
  • Anything not listed in the specification attached to your contract
  • Changes requested after sign-off — priced and agreed with you before they're executed
  • Requirement discussion and site assessment before the first layout is drawn
  • Floor plans developed and revised until you sign them off
  • Elevation design coordinated with the structure and the package finish level
  • Structural drawings — footing, column, beam and slab — to the engineer's design
  • Working drawings for electrical, plumbing and finishing
  • Drawings and documentation coordinated for your approval submissions
  • Material planned against the construction schedule rather than ordered in a rush
  • Steel, cement, aggregate and blocks to the specification in your contract
  • Finishing material selections confirmed with you before anything is ordered
  • Delivery scheduled to the stage, so the site isn't storing what it can't use yet
  • Material checked at delivery against the agreed specification
  • A single point of contact for the whole project
  • Stage-wise coordination — each phase reviewed and signed off before the next
  • Quality checks at foundation, RCC, masonry, services and finishing
  • Concrete grade, steel grade and cover maintained as per the structural design
  • Housekeeping, material storage and site safety practices
  • Updates as each stage closes — including the ones you'd rather not hear
  • Joint walkthrough with a snag list recorded, not remembered
  • Snags closed and re-checked before the keys change hands
  • Electrical, plumbing and drainage tested and demonstrated to you
  • Fittings, fixtures and finishes checked against the specification
  • Project drawings and documentation handed over
  • Site cleaned and the keys handed to you

This describes a standard, not a brand list. Inclusions, exclusions and grades move with the package you choose and the selections you make. Exact makes and models are confirmed in your project contract before anything is ordered.

Common questions

Things people ask first.

Often it costs less in total, because the scope is priced as a whole, material is planned rather than bought in a hurry, and the rework caused by uncoordinated trades doesn't end up on your bill. What it definitely costs less of is your time. What it costs more of, honestly, is control over each individual purchase — which is the trade you're making.

We prepare and coordinate the drawings and documentation your approvals need, and work alongside your consultant or liaison. The statutory fees, deposits and the approvals themselves stay in your name and outside the contract value — that's listed in the exclusions above, so it can't surprise you later.

Yes. Selections are made with you and written into the specification before procurement begins. What's in the contract is what gets installed. Change your mind later and we'll price the change and get it agreed before it happens, rather than adjust it quietly at the end.

Some delays are real — weather, approvals, a change you asked for. You'll hear about them when they happen, with a revised sequence, rather than at the end. The timeline is planned stage by stage precisely so a slip in one stage doesn't quietly become a slip everywhere.

One plot, one team

Hand it over.
Get it back finished.

Tell us about your plot and what you're planning to build. We'll come back with a scope, a specification and a realistic view of cost and timeline.